Short update of SteelConnect 2.0 production progress

A very short update this week.
1. Good News, we have sent our first batch of SteelConnect 2.0 Black Matte for PVD Coating. If nothing goes wrong(pray pray pray), we will be able to ship them by next week. However it will be shipped out batch by batch in a weekly basis from next week onwards. 
We have receive our PVD Titanium coated SteelConnect 2.0 in Champagne Gold Sample. The colour were stunning, and we have been wearing it since the day we got it.



 2. We had secured a second manufacturer which are using 5-axis CNC Machine. This is a more advance technology which could produce SteelConnect 2.0 with only 2 processes. The first manufacturer could only produce around 200 pieces per 10 working days and the defect percentage is 25%. The second manufacture would kick in to boost the supply capacity. We looking forward to our co-operation with the second manufacturer and will continue to monitor the progress closely.
Thats all for this week.Thank you so much and we cant wait to deliver the first batch of SteelConnect 2.0 to you soon. Have a bless day ahead. Cheers!

Comments

Post a Comment

Popular Posts